The hallway, study, and entry have flooring. He was working on the entry closet when we stopped by. Otherwise it's just the hallway leading to Maya's room and her room itself left to finish off the main floor. Still love the flooring.
The cabinet company hauled out all the doors that need to be re-done. It's a lot. But mistakes happen and they're going to make it right.
Two shed kits arrived today. One will go in the garden and the other is temporary storage until we get a shop built.
I keep striking out on finding a slab to replace the two pieces in the kitchen they messed up when drilling. Either they're already taken, or don't match the rest of the kitchen. And new supply is dependent on shipping containers...need I say more. I don't want to switch it for something that doesn't match as well, or isn't as pretty. We may keep what we have and learn to ignore the cracks. They're tiny, so that's good I suppose.
And there is a 480lb crate with our 200lb range hood inside, on it's way to WA! Can't wait to see it!